禹城鋼結(jié)構(gòu)板房建造時(shí)間解析

來源:http://m.fptdc.cn 日期:2025-06-03 發(fā)布人:

  在禹城,鋼結(jié)構(gòu)板房的建造時(shí)間因項(xiàng)目規(guī)模、工藝選擇及管理效率而異。以當(dāng)?shù)匮b配式建筑實(shí)踐為例,小型臨時(shí)板房從開工到交付可能僅需數(shù)日,而標(biāo)準(zhǔn)化廠房或性建筑通常需要數(shù)周數(shù)月。這種時(shí)間跨度差異主要源于建造流程的復(fù)雜性和外部因素的制約。

  In Yucheng, the construction time of steel structure slab houses varies depending on the project scale, process selection, and management efficiency. Taking local prefabricated building practices as an example, small temporary board houses may only take a few days from start to delivery, while standardized factories or permanent buildings typically take weeks to months. This difference in time span is mainly due to the complexity of the construction process and external constraints.

  建造流程的標(biāo)準(zhǔn)化程度直接影響工期。以禹城某棚改項(xiàng)目為例,其采用裝配式鋼結(jié)構(gòu)技術(shù),實(shí)現(xiàn)了“40小時(shí)/層”的施工速度。這一效率得益于模塊化設(shè)計(jì):構(gòu)件在工廠預(yù)制完成后,運(yùn)輸現(xiàn)場進(jìn)行螺栓連接或焊接組裝。此類項(xiàng)目的基礎(chǔ)處理階段通常需3-5天,包括地基開挖、混凝土澆筑及養(yǎng)護(hù);主體結(jié)構(gòu)安裝則以每天數(shù)百的速度推進(jìn),墻板、屋面系統(tǒng)及管線預(yù)埋同步進(jìn)行,大幅縮短了交叉作業(yè)時(shí)間。

  The standardization level of the construction process directly affects the project schedule. Taking a shed renovation project in Yucheng as an example, it adopts prefabricated steel structure technology and achieves a construction speed of "40 hours/floor". This efficiency is due to modular design: after the components are prefabricated in the factory, they are transported to the site for bolt connection or welding assembly. The basic treatment stage of such projects usually takes 3-5 days, including foundation excavation, concrete pouring, and maintenance; The installation of the main structure is progressing at a rate of several hundred square meters per day, with wall panels, roof systems, and pipeline embedment carried out simultaneously, greatly reducing the time for cross operation.

  材料供應(yīng)與加工精度是關(guān)鍵變量。禹城某鋼結(jié)構(gòu)企業(yè)數(shù)據(jù)顯示,當(dāng)采用熱軋H型鋼、彩鋼夾芯板等標(biāo)準(zhǔn)化材料時(shí),構(gòu)件加工周期可控制在7-15天內(nèi)。若涉及異形構(gòu)件或定制化設(shè)計(jì),則需額外增加5-10天用于圖紙深化及數(shù)控切割。材料到場后的質(zhì)量驗(yàn)收環(huán)節(jié)也不容忽視,某項(xiàng)目曾因鋼材厚度偏差導(dǎo)致3天的整改延誤,凸顯了供應(yīng)鏈管控的重要性。

  Material supply and processing accuracy are key variables. According to data from a steel structure enterprise in Yucheng, when using standardized materials such as hot-rolled H-beams and color steel sandwich panels, the processing cycle of components can be controlled within 7-15 days. If it involves irregular components or customized design, an additional 5-10 days are required for drawing deepening and CNC cutting. The quality acceptance process after the arrival of materials cannot be ignored. A certain project was delayed for 3 days due to a deviation in steel thickness, highlighting the importance of supply chain control.

  施工組織與管理水平對工期影響顯著。在禹城經(jīng)濟(jì)技術(shù)開發(fā)區(qū)某廠房項(xiàng)目中,施工方通過BIM技術(shù)優(yōu)化工序銜接,將傳統(tǒng)施工的“基礎(chǔ)-主體-裝修”線性流程改造為并行作業(yè)模式?;A(chǔ)施工階段即啟動構(gòu)件生產(chǎn),主體安裝時(shí)同步實(shí)施門窗安裝及設(shè)備基礎(chǔ)施工,終使總工期縮短28天。反觀管理粗放的項(xiàng)目,常因勞動力調(diào)配不當(dāng)或工序交接不暢導(dǎo)致5-10天的工期損耗。

  The level of construction organization and management has a significant impact on the project schedule. In a factory project in Yucheng Economic and Technological Development Zone, the construction party optimized the process connection through BIM technology, transforming the traditional linear process of "foundation main body decoration" into a parallel operation mode. The basic construction phase starts the production of components, and the installation of doors and windows and equipment foundations are carried out simultaneously during the main installation, ultimately shortening the total construction period to 28 days. On the other hand, projects with extensive management often result in 5-10 days of project duration loss due to improper labor allocation or poor process handover.

20220310023200679.jpg

  外部環(huán)境因素亦需納入考量。禹城春季施工易受沙塵天氣影響,某項(xiàng)目因此增加2天揚(yáng)塵治理停工;雨季則可能導(dǎo)致基礎(chǔ)施工周期延長30%-50%。政策審批效率同樣關(guān)鍵,當(dāng)?shù)亍澳玫丶撮_工”改革使某項(xiàng)目從簽約到開工縮短19天,而傳統(tǒng)流程需45-60天。

  External environmental factors also need to be taken into consideration. Yucheng's spring construction is easily affected by sandstorms, resulting in an additional 2 days of dust control work stoppage for a certain project; The rainy season may lead to a 30% -50% extension of the foundation construction period. The efficiency of policy approval is equally crucial. The local "land acquisition and start construction" reform has shortened the time from signing the contract to starting construction for a certain project to 19 days, while the traditional process takes 45-60 days.

  技術(shù)選擇對工期的決定性作用在禹城實(shí)踐中尤為突出。采用螺栓連接技術(shù)的臨時(shí)板房,4名工人每日可安裝150-200,300建筑3日內(nèi)即可完工。而要求氣密性、保溫性更高的建筑,需增加焊縫檢測、防腐涂裝等工序,單層建筑工期相應(yīng)延長7-10天。值得關(guān)注的是,禹城某企業(yè)研發(fā)的裝配式鋼結(jié)構(gòu)體系,通過預(yù)應(yīng)力張拉技術(shù)使單層安裝時(shí)間壓縮6小時(shí),為快速建造提供了新路徑。

  The decisive role of technology selection in the construction period is particularly prominent in the Yucheng practice. A temporary prefabricated house using bolt connection technology can be installed by 4 workers per day, covering an area of 150-200 square meters. A 300 square meter building can be completed within 3 days. For permanent buildings that require higher air tightness and insulation, additional processes such as weld seam testing and anti-corrosion coating are required, and the construction period for single story buildings is correspondingly extended to 7-10 days. It is worth noting that the prefabricated steel structure system developed by a certain enterprise in Yucheng has compressed the installation time of a single layer to 6 hours through prestressed tensioning technology, providing a new path for rapid construction.

  禹城鋼結(jié)構(gòu)板房的建造時(shí)間呈現(xiàn)顯著彈性:簡易臨時(shí)建筑可實(shí)現(xiàn)“即裝即用”,標(biāo)準(zhǔn)化廠房通常控制在1-2個月,復(fù)雜公建項(xiàng)目則需3-6個月。這種效率優(yōu)勢既源于本地企業(yè)技術(shù)積累,也與政府“店小二”式服務(wù)密不可分——通過并聯(lián)審批、容缺受理等機(jī)制,將傳統(tǒng)建設(shè)周期壓縮40%以上。未來隨著智能建造技術(shù)的普及,禹城鋼結(jié)構(gòu)板房的交付速度有望進(jìn)一步提升。

  The construction time of Yucheng steel structure slab houses shows significant flexibility: simple temporary buildings can achieve "ready to install and use", standardized factory buildings are usually controlled within 1-2 months, and complex public construction projects require 3-6 months. This efficiency advantage is not only derived from the technological accumulation of local enterprises, but also closely related to the government's "shop assistant" style service - through mechanisms such as parallel approval and vacancy acceptance, the traditional construction cycle is compressed by more than 40%. With the popularization of intelligent construction technology in the future, the delivery speed of Yucheng steel structure panel houses is expected to further improve.

  本文由禹城鋼結(jié)構(gòu)板房友情奉獻(xiàn).更多有關(guān)的知識請點(diǎn)擊:http://m.fptdc.cn真誠的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識我們將會陸續(xù)向大家奉獻(xiàn).敬請期待.

  This article is a friendly contribution from Yucheng Steel Structure Plate House For more information, please click: http://m.fptdc.cn Sincere attitude To provide you with comprehensive services We will gradually contribute more relevant knowledge to everyone Coming soon.