目前的活動(dòng)板房的質(zhì)量技術(shù)標(biāo)準(zhǔn),主要以地方標(biāo)準(zhǔn)和企業(yè)標(biāo)準(zhǔn)為主,并沒(méi)有相關(guān)的行業(yè)標(biāo)準(zhǔn)。
At present, the quality and technical standards of prefabricated houses are mainly local standards and enterprise standards, and there are no relevant industry standards.
1、依照相關(guān)法律法規(guī)以及規(guī)章制度的要求,企業(yè)標(biāo)準(zhǔn)都會(huì)備案,完全可確保災(zāi)區(qū)活動(dòng)板房的質(zhì)量。
1. According to the requirements of relevant laws and regulations and rules and regulations, enterprise standards will be put on record, which can fully ensure the quality and safety of prefabricated houses in disaster areas.
2、建筑施工現(xiàn)場(chǎng)使用的活動(dòng)房必須滿(mǎn)足強(qiáng)度和穩(wěn)定性的要求,確保結(jié)構(gòu),并有防御強(qiáng)臺(tái)風(fēng)、特大暴雨雪和雷擊的能力。同時(shí)應(yīng)符合文明衛(wèi)生、消防、和使用功能等要求。
2. The movable house used in the construction site must meet the requirements of strength and stability, ensure the structural safety, and have the ability to defend against strong typhoon, heavy rain, snow and lightning. At the same time, it should meet the requirements of civilized sanitation, fire protection, environmental protection and use function.
3、用于工作、生活的活動(dòng)房,原則上只允許搭設(shè)單層,長(zhǎng)度不得超過(guò)30米(8間),每間宿舍住宿人數(shù)不得超過(guò)8人?;顒?dòng)房旁應(yīng)配備符合消防要求的滅火器材。
3. In principle, only single storey rooms are allowed to be built for working and living, and the length shall not exceed 30 meters (8 rooms), and the number of accommodation in each dormitory shall not exceed 8 people. Fire fighting equipment meeting fire fighting requirements shall be provided beside the activity room.
4、因特殊原因,需搭設(shè)雙層活動(dòng)房,必須符合《建筑結(jié)構(gòu)荷載規(guī)范》GB50009—2001,且長(zhǎng)度不得超過(guò)22米(6間)。同時(shí),根據(jù)實(shí)際情況,須采取預(yù)埋底腳螺栓(型鋼)等聯(lián)結(jié)墻柱,并用鋼管將活動(dòng)房整體固定,對(duì)活動(dòng)房進(jìn)行加固。搭設(shè)雙層活動(dòng)房必須制訂搭設(shè)方案。
4. Due to special reasons, it is necessary to set up a double deck movable house, which must comply with the load code for the design of building structures (GB 5009-2001), and the length shall not exceed 22 meters (6 rooms). At the same time, according to the actual situation, it is necessary to adopt embedded foot bolts (section steel) to connect the wall column, and use steel pipe to fix the movable house as a whole to reinforce the movable house. It is necessary to work out a plan for setting up a double deck mobile house.
方案由使用單位、安裝單位技術(shù)負(fù)責(zé)人簽字認(rèn)可,并報(bào)所在地建筑監(jiān)督站備案。大江大河(湖)邊、曠野地區(qū)嚴(yán)禁搭設(shè)雙層活動(dòng)房。
The scheme shall be signed and approved by the technical director of the user and installation unit, and reported to the local construction safety supervision station for record. It is strictly forbidden to set up double-layer activity rooms on the banks of big rivers (lakes) and in wilderness areas.